Repair Procedures: Installation
- Installation is reverse of removal.
CVVT oil control valve installation bolt:
9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lbf.ft)
CAUTION: Pay attention to color of valve connector (Component and harness side) when installing. If an OCV is installed on opposite bank, the engine may be damaged.CONNECTOR COLORItem Component
SideHarness Side Bank1 (RH) Grey Bank 2(LH) Black