Repair Procedures: Installation
- Installation is the reverse of removal.
CVVT oil control valve installation bolt:
9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)
CAUTION:- Pay attention to color of valve connector (Harness side) and the blue marking on the chain cover when installing.
If an OCV is installed on opposite manifold, the engine may be damaged.
- Connect the CVVT oil control valve connector as below.
- Intake: OCV component marked blue color and the harness connector. (Gray)
- Exhaust: OCV component marked nothing and the harness connector. (Black)
CAUTION:- Install the component with the specified torques.
- Note that internal damage may occur when the component is dropped. In this case, use it after inspecting.
CONNECTOR COLOR REFERENCE CHARTItem Component
SideHarness
SideChain
Cover MarkIntake Black Gray Blue Exhaust Black Black Nothing - Pay attention to color of valve connector (Harness side) and the blue marking on the chain cover when installing.