LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Hyundai >> 2014 >> Azera Base >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System >> CVVT Oil Control Valve (OCV) >> Repair Procedures >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Repair Procedures: Installation

CAUTION:
  • Install the component with the specified torques.
  • Note that internal damage may occur when the component is dropped. If the component has been dropped, inspect before installing.
CAUTION:
  • Apply the engine oil to the valve O-ring.
CAUTION:
  • Exactly distinguish the color of the valve and harness connectors in bank 1 and 2 when installing, or the engine will operate abnormally (Refer to the chart below).
Items Component Side Harness Side
Bank 1 (RH) Grey
Bank 2 (LH) Black
  1. Installation is reverse of removal.

    CVVT oil control valve installation bolt: 

    9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)