Feedback Position Sensor
- Connect the GDS to the data link connector.
- Perform the fully open and the fully closing operation of the EEGR valve by using the actuation test.
- Check that the voltage is within the specification.
| Item |
Specification |
| Supply Voltage (V) |
5 |
| Opened Voltage (V) |
0.7 ~ 1.25 |
| Closed Voltage (V) |
3.85 ~ 4.15 |