Feedback Position Sensor
- Connect the GDS to the data link connector.
- Perform the fully open and the fully closing operation of the EEGR valve by using the actuation test.
- Check that the voltage is within the specification
| Item |
Specification |
| Opened Voltage (V) |
0.7-1.3 |
| Closed Voltage (V) |
3.9-4.5 |