With GST
- Start engine and warm it up to normal operating temperature.
- Turn ignition switch OFF and wait at least 10 seconds,
- Start engine and keep the engine speed between 3,500 and 4,000 RPM for at least 1 minute under no load.
- Let engine idle for 1 minute.
- Set voltmeter probes between ECM terminal 114 [HO2S1 (B1) signal] or 115 [HO2S1 (B2) signal] and ground.
- Check the following with engine speed held at 2,000 RPM constant under no-load.
Courtesy of NISSAN MOTOR CO., U.S.A.
- The voltage should go above 0.70V at least once.
- The voltage should go below 0.21V at least once.
- If NG, go to DIAGNOSTIC PROCEDURE .