LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Infiniti
>>
2007
>>
M35 Base
>>
Repair and Diagnosis
>>
Engine Performance
>>
System
>>
Engine Control System - Introduction (VQ35DE)
>>
Basic Service Procedure
>>
Idle Speed and Ignition Timing Check
>>
Method B
April 5, 2026:
LEMON Manuals is launched!
Read the announcement.
Method B
Remove No. 1 ignition coil.
Fig 1: Identifying Ignition Coil
Courtesy of NISSAN NORTH AMERICA, INC.
Connect No. 1 ignition coil and No. 1 spark plug with suitable high-tension wire as shown, and attach timing light clamp to this wire.
Fig 2: Identifying Ignition Coil, Spark Plug And High-Tension Wire
Courtesy of NISSAN NORTH AMERICA, INC.
Fig 3: Connecting Ignition Coil And Spark Plug With High-Tension Wire
Courtesy of NISSAN NORTH AMERICA, INC.
Check ignition timing.
Fig 4: Identifying Ignition Timing And Timing Indicator
Courtesy of NISSAN NORTH AMERICA, INC.