LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Isuzu >> 1984 >> Impulse Automatic >> Repair and Diagnosis >> Engine Performance >> System >> I-TEC Control System >> Testing >> Test 1 - Power Supply Check
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Test 1 - Power Supply Check

  1. Disconnect MCU control terminals at MCU. Turn ignition on, and check for battery voltage at terminals 29 and 41. If battery voltage is present, go to step 2). If no voltage at terminals, check main relay, starter switch, fuses, fusible link and circuits.
  2. Check for continuity between terminals 38 and 39 and ground. If ohmmeter does not show continuity to ground, check ground connection, terminal ends and wires.
Fig 1: Power Supply Check
G42068