Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters.
Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| In-Line4,Diesel | Includes: R&R Cylinder Liners. | 32.5 | A | |
| Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul: | ||||
| 4WD, w/Std Trans add | 1.5 | A | ||
| w/Frame Tie Bar add | 0.2 | 0.2 | A | |
| Where Air Cond interferes add | 0.6 | 0.6 | A | |
| Where Air Pump interferes add | 0.2 | 0.2 | A | |