Grind Complete
WARNING: This page is about the Cherokee Base, 2D Utility, 2.1 B, which is a different variant/trim than selected.
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| In-Line4,Diesel | 11.5 | A | ||
| Additional Procedure: VALVE: Grind Complete: | ||||
| Where Air Cond interferes add | 0.6 | A | ||
| Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble: Includes: Clean and replace necessary components only. | ||||
| In-Line4 | 0.5 | B | ||
| Combination Procedure: ROCKER ARM STUD: Remove & Replace: | ||||
| Each Additional | 0.2 | B | ||
| One | 0.3 | B | ||