2.5L TBI System
- Description
- Operation
- Component Testing
- System Diagnosis
- Preliminary Checks
- Diagnostic Test Charts
- Chart 1, Ignition Switch Off
- Chart 2-A, Ignition Switch On
- Chart 2-B, Ignition Switch On (Cont.)
- Chart 2-C, Ignition Switch On (Cont.)
- Chart 3, Throttle Position Sensor Test
- Chart 4-A, System Operational Test
- Chart 4-B, System Operational Test (Cont.)
- Chart 4-C, System Operational Test (Cont.)
- Chart 4-D, System Operational Test (Cont.)
- Chart 4-E, System Operational Test (Cont.)
- Chart 4-F, System Operational Test (Cont.)
- Chart 4-G, System Operational Test (Cont.)
- Chart 4-H, System Operational Test (Cont.)
- Chart 4-I, System Operational Test (Cont.)
- Chart 4-J, System Operational Test (Cont.)
- Chart 4-K, System Operational Test (Cont.)
- Chart 5, Basic Engine Test
- Chart 6-A, Man. Trans. Up-Shift Test
- Chart 6-B, Man. Trans. Up-Shift Test (Cont.)
- Removal & Installation
- Adjustments