Switch Continuity Test
NOTE:
Disconnect switch harness before testing continuity.
With the switch plunger retracted, attach the test leads to terminals No. 1 and 2. Replace switch if meter indicates no continuity. With the switch plunger retracted, attach the test leads to terminals No. 3 and 4. Replace switch if meter indicates no continuity. With the switch plunger extended, attach the test leads to terminals No. 5 and 6. Replace switch if meter indicates no continuity.