LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2009 >> Commander Overland, 4WD >> Repair and Diagnosis >> Engine Mechanical >> Fuel System >> Fuel Injection, Gas >> VALVE, Short Runner >> Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

VALVE, Short Runner: Installation: Installation

Fig 1: Short Runner Valve Actuator Rubber O-Ring Seal
GC0118917Courtesy of CHRYSLER LLC
  1. Install a new short runner valve actuator rubber O-ring seal (1).
    Fig 2: Short Runner Valve Actuator Retaining Bolts
    GC0118916Courtesy of CHRYSLER LLC
  2. Position the short runner valve actuator, install the retaining bolts (1) and tighten to 5 N.m (44 in. lb.).
    Fig 3: Intake Manifold Retaining Bolt Removal & Tightening Sequence
    GC0088124Courtesy of CHRYSLER LLC
  3. Install the intake manifold and throttle body as an assembly. Refer to Engine/Manifolds/MANIFOLD, Intake - Installation .
    Fig 4: Battery
    GC0087848Courtesy of CHRYSLER LLC
  4. Connect the negative battery cable (1).