LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2012 >> Grand Cherokee Laredo, AWD >> Repair and Diagnosis >> Engine Performance >> Ignition System (Service Information) >> Solenoid, Variable Valve Timing >> Installation >> Left
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Solenoid, Variable Valve Timing: Installation: Left

Fig 1: VVT Seal
GC0144209Courtesy of CHRYSLER GROUP, LLC
  1. Install the variable valve timing solenoid seals (1). The seals can be reused if not damaged.
    Fig 2: VVT Solenoids, Connectors & Mounting Bolts (Left)
    GC0144208Courtesy of CHRYSLER GROUP, LLC
  2. Refer to the markings made at disassembly and install the intake variable valve timing solenoid (4) and the exhaust variable valve timing solenoid (2) in their original locations.
  3. Install the variable valve timing solenoid mounting bolts (3) and tighten to 4 N.m (35 in. lbs.).
  4. Connect the electrical connector (1) to the variable valve timing solenoid.
    Fig 3: Air Inlet Hose, Air Temperature (IAT) Sensor Connector & Clamps
    GC0145457Courtesy of CHRYSLER GROUP, LLC
  5. Install the air inlet hose (3) to the air cleaner body and the throttle body. Tighten the clamps (1) and (4) to 4 N.m (35 in. lbs.).
  6. Connect the electrical connector (2) to the Inlet Air Temperature (IAT) sensor.
  7. Connect the negative battery cable and tighten nut to 5 N.m (45 in. lbs.).
NOTE:

The Cam/Crank Variation Relearn procedure must be performed using the scan tool anytime there has been a repair/replacement made to a powertrain system, for example: flywheel, valvetrain, camshaft and/or crankshaft sensors or components.