LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2017 >> Wrangler Rubicon, Automatic Trans >> Repair and Diagnosis >> Engine Performance >> Ignition System (Service Information) >> Solenoid, Variable Valve Timing >> Installation >> Left
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Solenoid, Variable Valve Timing: Installation: Left

GC0144209Courtesy of CHRYSLER GROUP, LLC
  1. Install the variable valve timing solenoid seals (1). The seals can be reused if not damaged.
    GC0144208Courtesy of CHRYSLER GROUP, LLC
  2. Refer to the markings made at disassembly and install the intake variable valve timing solenoid (4) and the exhaust variable valve timing solenoid (2) in their original locations.
  3. Install and securely tighten the variable valve timing solenoid mounting bolts (3).
  4. Connect the electrical connector (1) to the variable valve timing solenoid.
    GC0154016Courtesy of CHRYSLER GROUP, LLC
  5. Install the left front upper intake manifold support bracket (1) with two nuts (2) and two bolts (3). Tighten the nuts (2) to 10 N.m (89 in. lbs.) and tighten the bolts (3) to 10 N.m (89 in. lbs.).
    GC0154042Courtesy of CHRYSLER GROUP, LLC
  6. Install the throttle body (1). Refer to THROTTLE BODY, INSTALLATION .
  7. Install the engine cover. Refer to COVER, ENGINE, INSTALLATION .
  8. Connect the negative battery cable.
NOTE:

The Cam/Crank Variation Relearn procedure must be performed using the scan tool anytime there has been a repair/replacement made to a powertrain system, for example: flywheel, valvetrain, camshaft and/or crankshaft sensors or components.