LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2021 >> Cherokee High Altitude, Automatic T/Case Control >> Repair and Diagnosis >> Engine Performance >> 2.0L Ignition System (Service Information) >> Solenoid, Variable Valve Timing >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Solenoid, Variable Valve Timing: Installation

GC0181478Courtesy of CHRYSLER GROUP, LLC
  1. Install a NEW  gasket (1).
    GC0181764Courtesy of CHRYSLER GROUP, LLC
  2. Install the Variable Valve Timing (VVT) solenoid (1) and tighten the bolts (2) to the proper torque specification. Refer to (TORQUE SPECIFICATIONS ).
    GC0186994Courtesy of CHRYSLER GROUP, LLC
  3. If removed, install the right isolator to engine mount bracket bolt (2) and tighten to the proper torque specification. Refer to (TORQUE SPECIFICATIONS ).
    GC0181153Courtesy of CHRYSLER GROUP, LLC
  4. Connect the VVT solenoid wire harness connector (1).
  5. Install the clean air hose and air cleaner body cover. Refer to INSTALLATION .
  6. Install the top engine cover. Refer to COVER, ENGINE, INSTALLATION .
  7. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector to the negative battery cable.