LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2021 >> Cherokee Trailhawk >> Repair and Diagnosis >> Electrical >> Body Electrical >> Power Distribution >> Module, Power Inverter >> Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Module, Power Inverter: Operation

Once an item is plugged into the Alternating Current (AC) power outlet, or if equipped with an enable touch switch and it is actuated, the voltage input request to supply voltage to the power outlet is performed. The Body Control Module (BCM) sends an enable signal and voltage to the Power Inverter Module (PIM). The PIM converts this 12v input to a 115v AC output for NAFTA vehicles or 230v AC for BUX vehicles. The PIM then supplies the AC voltage to the power outlet.

Power remains active until one of the following events occur (normal operation):

A device plugged into the outlet can overload the inverter. High startup current requirement that may be 5 to 10 times the operating current will trigger a fault and the inverter will think it is a short and shut down. Motors and power units with a lot of input capacitance will cause this.