Repair Procedures: Installation
- Before installation, insert "N range fixing pin" (A) of shift lever after checking the shift lever and manual control lever are on "N" range.
- Install the shift cable retainer (A) by tightening nuts (B).
Tightening torque:
11.8 - 14.7 N.m (1.2 - 1.5 kgf.m, 8.7 - 10.8 lb.ft)
- Install the cable socket (A).
- Install the shift cable to the lever pin and then insert the snap pin (A).
- Tighten the nut (B) to the specified torque after removing free play by pushing the shift cable (A) in the direction of the arrow.
Tightening torque:
9.8 - 13.7 N.m (1.0 - 1.4 kgf.m, 7.2 - 10.1 lb.ft)
NOTE: The existing shift cable clip must be replaced with new one. (Do not reuse it.) - Make sure to get rid of "N range fixing pin" (A) after installing the shift lever assembly.
- Install the floor console assembly.
(Refer to Body - "FLOOR CONSOLE ASSEMBLY ")
- Install the knob (A) by pressing it in the direction of arrow after installing the boots to the console upper cover.
- Install the battery and battery tray.
(Refer to Engine Electrical System - "BATTERY ")
- Install the air duct and air cleaner assembly.
(Refer to Engine Mechanical System - " AIR CLEANER ")