Component Inspection
- Connect the KDS on the Data Link Connector (DLC).
- Turn the ignition ON.
- Measure the output voltage of the APS 1 and 2 at C.T and W.O.T.
Specification: Refer to "SPECIFICATION "
Pin Function 1 APS 2 ground 2 APS 1 ground 3 APS 1 signal 4 APS 1 power (5 V) 5 APS 2 power (5 V) 6 APS 2 signal