18.30.01 Engine control module (ECM) - Non NAS: Refit
- Fit ECM into 'E' box.
- Position and connect multiplug to ECM and secure latch.
- Fit 'E' box cover and tighten Allen screws to 2 Nm (1.5 lbf.ft).
- Connect battery earth lead.
- If a new ECM has been fitted, reset adaptions using T4.