Ground Circuits (SC300)
Ensure ignition is off. Disconnect connectors from ECM. Using an ohmmeter, measure resistance between connector E10 terminals No. 15, 16, 17, 18, 19, and 20, and connector E9 terminals No. 31 and 32. See Fig 1. Resistance should be approximately 13.2-14.2 ohms.