Fuel Injector Circuit
- Turn ignition off. Pull back the right front floor mat. Remove ECM protective cover. Connect Check Harness (09990-01000) between ECM and harness. See USING CHECK HARNESS under INTRODUCTION. Turn ignition on.
- Measure voltage between chassis ground and terminals No. 17-20 of ECM connector "B". To identify ECM connectors and terminals, see Figure.
- If battery voltage is present at all terminals, go to next step. If battery voltage is not present at all terminals, check ignition main relay. See RELAYS under MODULES, MOTORS, RELAYS & SOLENOIDS. If ignition main relay is okay, repair harness between ignition main relay and battery.
- Check for continuity between chassis ground and terminals No. 79 and 80 (White/Black wires) of ECM connector "B". If continuity does not exist, repair open White/Black wires. If continuity exists, check for open circuits between ignition main relay and injectors, and between injectors and ECM.
- If circuits are okay, measure injector resistance and volume. See FUEL INJECTOR RESISTANCE and FUEL INJECTOR VOLUME. If resistance and volume are as specified, replace ECM.