A/C Cut Control System
CAUTION:
If ECM replacement is instructed, always ensure ECM harness connector and ground circuit are okay. If either are suspect, repair as necessary and repeat testing to confirm ECM malfunction.
- Access ECM connectors behind glove box. Turn ignition on. Leave harness connectors attached to ECM. Backprobing connector, measure voltage between chassis ground and terminal No. 5 (Light Green/Red wire) at ECM E10 connector. See Figure. With A/C on, battery voltage should be present. With A/C off, 0-2 volts should be present.
- If voltage is as specified, replace ECM and retest. If voltage is not as specified, check for open or short in circuit between ECM andA/C control assembly. See appropriate wiring diagram in WIRING DIAGRAMS article. If circuit is okay, replace A/C control assembly.