Knock Sensor: Replacement
- DRAIN ENGINE COOLANT (See ENGINE COOLANT )
- WORK FOR PREVENTING GASOLINE FROM SPILLING OUT (See PRECAUTION )
- REMOVE V-BANK COVER
- REMOVE INTAKE AIR CONNECTOR PIPE
- REMOVE THROTTLE BODY ASSY (See REPLACEMENT )
- REMOVE INTAKE MANIFOLD ASSY
- Disconnect the fuel pipe sub-assy No. 2 from the fuel main tube (See PRECAUTION ).
- Disconnect the VSV connector for EVAP.
- Disconnect the EVAP hose from the VSV for EVAP.
- Remove the bolt, disconnect the VSV for EVAP from the upper intake manifold.
- Remove the bolt and V-bank cover bracket No. 2.
- Remove the bolt and V-bank cover bracket No. 3.
- Disconnect the VSV connector for IAC Valve.
- Remove the bolt and V-bank cover bracket No. 1.
- Remove the bolt and V-bank cover bracket No. 4.
- Remove the 4 bolts, and disconnect the engine wire protector (LH side) from upper intake manifold and camshaft bearing cap.
- Disconnect the 2 wire clamps on the engine wire (RH side) from the brackets on the RH delivery pipe.
- Remove the 2 bolts, and disconnect the engine wire protector (rear side) from the rear water by-pass joint and RH cylinder head.
- Disconnect the 8 injector connectors.
- Remove the 6 bolts, 4 nuts, the upper and lower intake manifolds assembly and 2 gaskets.
- REMOVE KNOCK SENSOR
- Disconnect the 2 knock sensor connectors.
- Remove the 2 nuts and 2 knock sensors.
- INSTALL KNOCK SENSOR
- Install the 2 knock sensors with the 2 nuts, as shown in the illustration.
Torque: 20 N.m (204 kgf.cm, 15 ft.lbf)
- Connect the 2 knock sensor connectors.
- Install the 2 knock sensors with the 2 nuts, as shown in the illustration.
- INSTALL INTAKE MANIFOLD ASSY
- Place 2 new gaskets on the cylinder heads with the white mark facing outward.NOTE: Be careful of the installation direction.
- Install the upper and lower intake manifolds assembly with the 6 bolts and 4 nuts.
Torque: 18 N.m (185 kgf.cm, 13 ft.lbf)
- Connect the 8 injector connectors.
- Install the engine wire protector (rear side0 with the 2 bolts.
- Install the engine wire protector (LH side) with the 4 bolts.
- Install the 2 wire clamps on the engine wire (RH side) to the brackets on the RH delivery pipe.
- Install the V-bank cover bracket No. 4 with bolt.
Torque: 7.5 N.m (76.5 kgf.cm, 66 in.lbf)
- Install the V-bank cover bracket No. 1 with bolt.
Torque: 7.5 N.m (76.5 kgf.cm, 66 in.lbf)
- Connect the VSV connector for IAC Valve.
- Install the V-bank cover bracket No. 3 with bolt.
Torque: 7.5 N.m (76.5 kgf.cm, 66 in.lbf)
- Install the V-bank cover bracket No. 2 with bolt.
Torque: 7.5 N.m (76.5 kgf.cm, 66 in.lbf)
- Connect the VSV for EVAP to the intake manifold with the bolt.
Torque: 7.5 N.m (76.5 kgf.cm, 66 in.lbf)
- Connect the EVAP hose to the VSV for EVAP.
- Connect the VSV connector for EVAP.
- Connect the fuel pipe sub-assy No. 2 to the fuel main tube (See PRECAUTION ).
- Place 2 new gaskets on the cylinder heads with the white mark facing outward.
- INSTALL THROTTLE BODY ASSY (See REPLACEMENT )
- INSTALL INTAKE AIR CONNECTOR PIPE
- INSPECT FUEL PUMP OPERATION AND CHECK FOR FUEL LEAKS (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER
Torque: 5.0 N.m (51 kgf.cm, 44 in.lbf)
- REFILL ENGINE COOLANT (See ENGINE COOLANT )
- CHECK FOR ENGINE COOLANT LEAKS (See INSPECTION )
- POWER WINDOW CONTROL SYSTEM INITIALIZE (See INITIALIZATION )
- FRONT POWER SEAT CONTROL SYSTEM INITIALIZE (See INITIALIZATION )