Throttle Body ASSY (3MZ-FE): Replacement
- DRAIN ENGINE COOLANT (See ENGINE COOLANT (3MZ-FE) )
- REMOVE V-BANK COVER SUB-ASSY
- Using a socket hexagon wrench 5, remove the 3 nuts.
- Remove the V-bank cover.
- REMOVE AIR CLEANER INLET NO. 2 (See REPLACEMENT )
- REMOVE AIR CLEANER ASSY (See REPLACEMENT )
- REMOVE INTAKE AIR RESONATOR
- Remove the ventilation hose No. 2.
- Remove the fuel vapor feed hose from the 2 hose clamps.
- Loosen the air cleaner hose clamp bolt, and then remove the intake air resonator.
- REMOVE THROTTLE BODY ASSY
- Disconnect the throttle motor connector.
- Disconnect the water by-pass hose No. 2.
- Disconnect the water by-pass hose No. 3.
- TMC Made
- Remove the 4 bolts, and then remove the throttle body.
- TMMWV Made
- Remove the 2 bolts and 2 nuts, and then remove the throttle body.
- Remove the gasket from the intake air connector.
- INSTALL THROTTLE BODY ASSY
- Install a new gasket to the intake air connector.
- TMC Made
- Install the throttle body with the 4 bolts.
Torque: 11 N.m (112 kgf.cm, 8 ft.lbf)
- Install the throttle body with the 4 bolts.
- TMMWV Made
- Install the throttle body with the 2 bolts and 2 nuts.
Torque: 11 N.m (112 kgf.cm, 8 ft.lbf)
- Install the throttle body with the 2 bolts and 2 nuts.
- Connect the water by-pass hose No. 3.
- Connect the water by-pass hose No. 2.
- Connect the throttle motor connector.
- INSTALL INTAKE AIR RESONATOR
- INSTALL AIR CLEANER ASSY (See REPLACEMENT )
- INSTALL AIR CLEANER INLET NO. 2 (See REPLACEMENT )
- CHECK CONNECTION OF VACUUM HOSE (See step 178 in REPLACEMENT )
- ADD ENGINE COOLANT (See ENGINE COOLANT (3MZ-FE) )
- CHECK FOR ENGINE COOLANT LEAKS (See COOLING SYSTEM (3MZ-FE) )
- INSTALL V-BANK COVER SUB-ASSY
- Fit the 2 retainers and install the V-bank cover.
- Using a socket hexagon wrench 5, tighten the 3 nuts.
Torque: 7.9 N.m (81 kgf.cm, 70 in.lbf)