Fuel Injector: Installation
- INSTALL FUEL INJECTOR ASSEMBLY
- Apply a light coat of spindle oil or gasoline to new O-rings, and install them to each injector.
- Apply a light coat of spindle oil or gasoline where the fuel delivery pipe contacts the O-ring.
- Push the fuel injector while turning it to install the injector in the fuel delivery pipe.
- Position the fuel injector connector outward.
- Install 6 new insulators to the intake manifold.
- Place the fuel delivery pipe which has the 6 fuel injectors installed to it in position on the intake manifold.NOTE: Be careful not to drop the fuel injectors when installing the fuel delivery pipe.
- Temporarily install the 5 bolts which are used to hold the fuel delivery pipe to the intake manifold.NOTE: After installing the fuel injectors, check that they turn smoothly. If not, reinstall the injectors with new O-rings.
- Tighten the 5 bolts which are used to hold the fuel delivery pipe to the intake manifold.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Connect the 6 fuel injector connectors.
- CONNECT FUEL TUBE SUB-ASSEMBLY
- Push in the tube connector onto the pipe until the tube connector makes a "click" sound.NOTE:
- Before connecting the tube, make sure that it is not damaged. Make sure that there is no dirt present on the connecting surfaces.
- After connecting, check that the fuel tube connector and the pipe are securely connected by pulling on them.
- Install the No. 2 fuel pipe clamp.
- Push in the tube connector onto the pipe until the tube connector makes a "click" sound.
- INSTALL INTAKE AIR SURGE TANK ASSEMBLY NOTE: DO NOT apply oil to the bolts listed below:TIGHTENING PARTS
Tightening Parts Surge Tank and Intake Manifold No. 1 Surge Tank Stay and Surge Tank Throttle Body Bracket and Surge Tank - Install a new gasket to the intake air surge tank.
- Using a 5 mm hexagon socket wrench, install the 4 bolts. (*1)
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Install the intake air surge tank with the 2 nuts and 2 bolts. (*2)
Torque: Nut
16 N*m (163 kgf*cm, 12 ft.*lbf)
Bolt
21 N*m (214 kgf*cm, 15 ft.*lbf)
- Connect the connector.
- Install the vacuum hose clamp with the bolt.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Connect the union to check valve hose. (*1)
- Connect the No. 1 ventilation hose. (*2)
- Install the clamp and connect the throttle with motor body assembly connector. (*3)
- Connect the vapor feed hose. (*4)
- Connect the 2 water by-pass hoses to the throttle with motor body assembly. (*5)
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- ADD ENGINE COOLANT (See ON-VEHICLE INSPECTION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- CHECK FOR ENGINE COOLANT LEAKS (See COOLING SYSTEM )
- CHECK FOR FUEL LEAKS (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FRONT SUSPENSION CENTER UPPER BRACE
- INSTALL ENGINE ROOM SIDE COVER RH (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- PERFORM INITIALIZATION
- Perform initialization procedures (See
INITIALIZATION
)
HINT:
Some systems need initialization after reconnecting the cable to the negative battery terminal.
- Perform initialization procedures (See
INITIALIZATION
)