LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2007 >> GS 430 >> Repair and Diagnosis >> Engine Performance >> Engine Control System (3UZ-FE) >> Integration Relay >> Removal
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Integration Relay: Removal

  1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL 
    CAUTION: Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt pretensioner activation.
  2. REMOVE COOL AIR INTAKE DUCT SEAL (See  REMOVAL  ) 
  3. REMOVE ENGINE ROOM SIDE COVER LH (See  REMOVAL  ) 
  4. REMOVE INTEGRATION RELAY 
    1. Remove the engine room No. 2 junction block cover.
    2. Using a screwdriver, detach the 2 claws and disconnect the integration relay from the engine room No. 2 junction block.

      HINT:

      Tape the screwdriver tip before use.

    3. Disconnect the 3 connectors.
      Fig 1: Identifying Engine Room No. 2 Junction Block Cover
      G05285396Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002