Ignition Coil: Installation
- INSTALL IGNITION COIL ASSEMBLY
- Install the 6 ignition coils with the 6 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the 6 ignition coil connectors.
- Attach the 3 wire harness clamps and connect the noise filter connector.
- Install the 6 ignition coils with the 6 bolts.
- INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE (See INSTALLATION )
- INSTALL NO. 2 VENTILATION HOSE (See INSTALLATION )
- INSTALL V-BANK COVER (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER RH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL SERVICE PLUG GRIP (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION (2006/02-2006/07)
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION (2006/02-2006/07)
).