Shift Lever Assembly: Installation
- INSTALL FLOOR SHIFT ASSEMBLY
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Install the transmission floor shift assembly with the 4 bolts.
Torque: 12 N*m (122 kgf*cm, 9.0 ft.*lbf)
- Connect the connector on the transmission floor shift assembly.
- Install the transmission floor shift assembly with the 4 bolts.
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Connect the transmission control cable assembly with the clip, from the floor shift lever assembly.
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
NOTE:- Protrusion facing upward.
- When the nut is remove, be sure to tighten the nut.
- Connect the transmission control cable assembly with the clip, from the floor shift lever assembly.
- INSTALL UPPER CONSOLE PANEL ASSEMBLY
- INSTALL NO. 2 CONSOLE UPPER PANEL GARNISH
- INSTALL NO. 1 CONSOLE UPPER PANEL GARNISH
- INSTALL FLOOR SHIFT LEVER KNOB SUB-ASSEMBLY
- Install the floor shift lever knob sub-assembly.
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
- Install the shift lever knob sub-assembly.
- CONNECT BATTERY NEGATIVE TERMINAL
- INSPECT SHIFT LEVER POSITION (See ADJUSTMENT )
- ADJUST SHIFT LEVER POSITION (See ADJUSTMENT )