Throttle Body: Installation
- INSTALL THROTTLE BODY
- Install a new gasket to the intake manifold.
- Connect the No. 4 water by-pass hose and No. 5 water by-pass hose to the throttle body.NOTE: Position the claws of the clamps as shown in the illustration.
- Install the throttle body with the 4 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the throttle motor connector.
- INSTALL INTAKE AIR CONNECTOR PIPE
- Align the protrusion of the intake air resonator with the cutout of the bracket and insert the protrusion.
- Install the intake air connector pipe with the 3 hose clamps.
Torque:
4.8 N*m (48 kgf*cm, 42 in.*lbf) for intake air connector pipe and throttle body
3.8 N*m (38 kgf*cm, 34 in.*lbf) for intake air connector pipe and intake air resonator
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
NOTE: Insert the protrusion of the intake air connector pipe into the hole of the hose clamp.HINT:
- The intake air connector pipe and throttle body can be tightened within the range of 4.0 N*m (41 kgf*cm, 35 in.*lbf) to 5.5 N*m (56 kgf*cm, 49 in.*lbf), and the intake air connector pipe and intake air resonator can be tightened within the range of 2.0 N*m (20 kgf*cm, 18 in.*lbf) to 5.5 N*m (56 kgf*cm, 49 in.*lbf).
- When tightening the hose clamp, make sure the hose clamp's end is within the painted white line (width: 2 mm or 0.079 in).
- Connect the No. 1 ventilation hose and No. 2 ventilation hose to the intake air connector pipe.NOTE:
- Position the claws of the clamps as shown in the illustration.
- Install the clips so that they are within the hose's paint marks.
- INSTALL NO. 1 AIR CLEANER INLET
- Align the holes with the connection areas labeled A, and attach the No. 1 air cleaner inlet.
- Install the No. 1 air cleaner inlet with the 2 bolts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- ADD ENGINE COOLANT (See REPLACEMENT )
- INSPECT FOR ENGINE COOLANT LEAK (See ON-VEHICLE INSPECTION )
- INSTALL AIR CLEANER INLET COVER
- Attach the 4 clips B.NOTE:
- Make sure the clips are attached securely.
- Attaching the clips forcefully or hitting the top of the clips may damage them.
- Install the air cleaner inlet cover with the 5 clips A.
- Attach the 4 clips B.
- INSTALL V-BANK COVER SUB-ASSEMBLY
- After sliding the cover from the vehicle front to the rear to attaching the 2 clips A, attach the 4 clips B and install the V bank cover.NOTE:
- Make sure the clips are attached securely.
- Attaching the clips forcefully or hitting the top of the clips may damage them.
- After sliding the cover from the vehicle front to the rear to attaching the 2 clips A, attach the 4 clips B and install the V bank cover.
- INSTALL NO. 1 ENGINE UNDER COVER ( See REPLACEMENT )
- INSTALL COWL TOP VENTILATOR LOUVER RH (See INSTALLATION )
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).