Ignition Coil: Installation
- INSTALL IGNITION COIL ASSEMBLY
- Install the 6 ignition coils with the 6 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the 6 ignition coil connectors.
- Install the 6 ignition coils with the 6 bolts.
- INSTALL NO. 1 SURGE TANK STAY
- Install the No. 1 surge tank stay with the bolt.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Install the bolt and clamp.
Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf)
- Install the No. 1 surge tank stay with the bolt.
- INSTALL INTAKE AIR SURGE TANK ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- INSTALL COWL TOP PANEL OUTER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
(See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See INSTALLATION )
- ADD ENGINE COOLANT (See ON-VEHICLE INSPECTION )
- CHECK FOR ENGINE COOLANT LEAKS (See ON-VEHICLE INSPECTION )
- INSTALL NO. 1 ENGINE UNDER COVER
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE ROOM COVER SIDE (See INSTALLATION )
- PERFORM INITIALIZATION
- Perform initialization procedure (See INITIALIZATION
).
HINT:
Some systems need initialization after reconnecting the cable to the negative battery terminal.
- Perform initialization procedure (See INITIALIZATION
).