Skid Control Ecu: Installation
- INSTALL SKID CONTROL BUZZER ASSEMBLY
- INSTALL SKID CONTROL ECU
- Install the ECU with the 2 bolts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Connect the ECU and skid control buzzer connectors.
- Install the ECU with the 2 bolts.
- INSTALL LOWER NO. 1 INSTRUMENT PANEL AIR BAG ASSEMBLY (See INSTALLATION )
- INSTALL NO. 1 INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FRONT DOOR OPENING TRIM COVER LH (See INSTALLATION )
- INSTALL DOOR SCUFF PLATE ASSEMBLY LH (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).
- CHECK SRS WARNING LIGHT
- Check the SRS warning light (see DIAGNOSIS SYSTEM ).
- PERFORM YAW RATE SENSOR ZERO POINT CALIBRATION
- Perform the yaw rate sensor zero point calibration (see CALIBRATION ).
- CHECK VSC SENSOR SIGNAL
- Check the VSC sensor signal (see TEST MODE PROCEDURE ).