Charging Systems: Charging: Generator: Installation
- INSTALL GENERATOR ASSEMBLY
- Install the generator with the 2 nuts and bolt.
Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf) for bolt and nut A
15 N*m (153 kgf*cm, 11 ft.*lbf) for nut B
- Connect the engine wire bracket with the bolt.
- Install the generator with the 2 nuts and bolt.
- INSTALL VANE PUMP PULLEY
- Using SST, install the vane pump pulley with the nut.
SST 09960-10010
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Using SST, install the vane pump pulley with the nut.
- INSTALL FAN AND GENERATOR V BELT (See INSTALLATION )
- INSTALL ENGINE UNDER COVER
- INSTALL V-BANK COVER (See INSTALLATION )
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).