Intake Manifold: Installation
- INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET
- Install 2 new gaskets to the cylinder head as shown in the illustration.
HINT:
Make sure the white paint marks are facing upward.
- Install 2 new gaskets to the cylinder head as shown in the illustration.
- INSTALL INTAKE MANIFOLD
- Install the intake manifold with the 6 bolts and 4 nuts.
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Connect the 8 injector connectors.
- Disconnect the ventilation hose.
- Connect the air hose for the power steering.
- Connect the vacuum hose for the brake booster.
- Install the intake manifold with the 6 bolts and 4 nuts.
- INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY
- Using SST, install the fuel pipe.
SST 09023-38401
Torque: 35 N*m (357 kgf*cm, 26 ft.*lbf) for use without SST
28 N*m (286 kgf*cm, 21 ft.*lbf) for use with SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).
- Using SST, install the fuel pipe.
- INSTALL PURGE VSV
- Install the purge VSV with the bolt.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Connect the 2 hoses for the purge VSV.
- Connect the purge VSV connector.
- Install the purge VSV with the bolt.
- INSTALL NO. 4 V-BANK COVER BRACKET
- Install the cover bracket with the 2 nuts.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the cover bracket with the 2 nuts.
- INSTALL NO. 3 V-BANK COVER BRACKET
- Install the cover bracket with the bolt.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the cover bracket with the bolt.
- INSTALL NO. 2 V-BANK COVER BRACKET
- Install the cover bracket with the bolt.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the cover bracket with the bolt.
- INSTALL NO. 1 V-BANK COVER BRACKET
- Install the cover bracket with the bolt.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the cover bracket with the bolt.
- INSTALL THROTTLE BODY ASSEMBLY (See INSTALLATION )
- INSTALL INTAKE AIR CONNECTOR PIPE
- Install the intake air connector pipe with the bolt and hose clamp.
Torque: 4.0 N*m (41 kgf*cm, 35 in.*lbf) for hose clamp
5.0 N*m (51 kgf*cm, 44 in.*lbf) for bolt
- Connect the air hose and ventilation hose together.
- Install the intake air connector pipe with the bolt and hose clamp.
- CHECK FOR FUEL LEAKS (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER
- Install the V-bank cover with the 2 nuts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the V-bank cover with the 2 nuts.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).
- ADD ENGINE COOLANT (See COOLANT )
- CHECK FOR ENGINE COOLANT LEAKS (See COOLING SYSTEM )