Automatic Transaxle: TCM: Installation
- INSTALL TCM
- Install the TCM to the transaxle.
- Install and tighten the 2 bolts in the order shown in the illustration.
Torque: 11 N*m (115 kgf*cm, 8 ft.*lbf)
- Connect the connector to the TCM.
- Turn the lock lever and secure the connector with the lock lever.
- INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY
(Refer to appropriate step under INSTALLATION ).
- INSTALL NO. 1 AIR CLEANER INLET
(Refer to appropriate step under INSTALLATION ).
- INSTALL AIR CLEANER INLET ASSEMBLY
(Refer to appropriate step under INSTALLATION ).
- INSTALL BATTERY
(Refer to appropriate step under INSTALLATION ).
- INSTALL COOL AIR INTAKE DUCT SEAL
(Refer to appropriate step under INSTALLATION ).
- PERFORM TCM REGISTRATION
HINT:
(See REGISTRATION )
- PERFORM INITIALIZATION
- Perform initialization procedure (See
INITIALIZATION
).NOTE: Some systems need initialization after reconnecting the cable to the negative battery terminal.
- Perform initialization procedure (See
INITIALIZATION
).