Throttle Body: Installation
- INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY
- Install a new gasket and the throttle body with the 3 bolts and nut.
Torque: 14 N*m (143 kgf*cm, 10 ft.*lbf)
- Connect the water by-pass hose, water by-pass hose No. 7 and throttle position sensor connector.
- Install a new gasket and the throttle body with the 3 bolts and nut.
- INSTALL AIR CLEANER HOSE ASSEMBLY
- ADD ENGINE COOLANT (See REPLACEMENT )
- CHECK FOR ENGINE COOLANT LEAKS (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER SUB-ASSEMBLY
- Install the V-bank cover sub-assembly with the 2 nuts.
Torque: 7.5 N*m (80 kgf*cm, 66 in.*lbf)
- Install the V-bank cover sub-assembly with the 2 nuts.