Throttle Body: Removal
- DRAIN ENGINE COOLANT
(See REPLACEMENT
)
- REMOVE V-BANK COVER SUB-ASSEMBLY
- Remove the 2 nuts and V-bank cover sub-assembly.
- REMOVE AIR CLEANER HOSE ASSEMBLY
- Disconnect the vacuum hoses (for the P/S idle-up and fuel pressure regulator) and ventilation hose.
- Remove the air cleaner hose assembly.
- REMOVE THROTTLE WITH MOTOR BODY ASSEMBLY
- Disconnect the water by-pass hose, water by-pass hose No. 7 and the throttle position sensor connector.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Remove the 3 bolts and nut.
- Remove the throttle body and the throttle body gasket
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002