Skid Control Ecu: Installation
- INSTALL SKID CONTROL ECU
- Install the skid control ECU with the 3 screws
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
HINT
- Align positioning boss (A) of the blower assembly with the hole of the skid control ECU.
- Securely engage hook (B) of the skid control ECU with the blower assembly
- Connect the 3 connectors to the skid control ECU.
- Install the skid control ECU with the 3 screws
- INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL SIDE INSTRUMENT PANEL RH (See INSTALLATION )
- INSTALL FRONT DOOR OPENING TRIM COVER RH (See INSTALLATION )
- INSTALL FRONT DOOR SCUFF PLATE RH (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).
- PERFORM YAW RATE AND ACCELERATION SENSOR ZERO POINT CALIBRATION
(See CALIBRATION )
- CHECK FOR SENSOR SIGNAL
(See TEST MODE PROCEDURE )
- CHECK AND CLEAR DTC
HINT
(See DTC CHECK / CLEAR )