Shift Lever: Installation
- INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
- Install the floor shift assembly with the 4 bolts
Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf)
- Connect the 4 clamps to the floor shift assembly
- Connect the 2 connectors to the floor shift assembly
- Install the floor shift assembly with the 4 bolts
- CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- Temporarily tighten the floor shift gear shifting rod with the nut
HINT
The rod is tightened to a torque specification in the "ADJUST SHIFT LEVER POSITION" procedure
- Temporarily tighten the floor shift gear shifting rod with the nut
- ADJUST SHIFT LEVER POSITION (See ADJUSTMENT )
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (See INSTALLATION )
- CONNECT HEATED OXYGEN SENSOR (See INSTALLATION )
- INSTALL FRONT CENTER FLOOR BRACE (See INSTALLATION )
- INSTALL REAR NO. 1 FLOOR PANEL BRACE (See INSTALLATION )
- INSTALL TAIL EXHAUST PIPE ASSEMBLY (See INSTALLATION )
- INSTALL NO. 2 FLOOR UNDER COVER (See INSTALLATION )
- INSTALL NO. 1 FLOOR UNDER COVER (See INSTALLATION )
- INSTALL NO. 2 CONSOLE BOX DUCT (See INSTALLATION )
- INSTALL CONSOLE BOX (See INSTALLATION )
- INSTALL CONSOLE BOX REGISTER ASSEMBLY (See INSTALLATION )
- INSTALL REAR ASH RECEPTACLE ASSEMBLY (See INSTALLATION )
- INSTALL FRONT ASH RECEPTACLE ASSEMBLY (See INSTALLATION )
- INSTALL CONSOLE PANEL SUB-ASSEMBLY (See INSTALLATION )
- INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH (See INSTALLATION )
- INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH (See INSTALLATION )
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).
- INSPECT SHIFT LEVER POSITION (See ON-VEHICLE INSPECTION )
- INSPECT FOR EXHAUST GAS LEAK