VVT Sensor: Inspection: Installation
- INSTALL VVT SENSOR
- Install the 2 sensors with the 2 bolts.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- INSTALL INTAKE MANIFOLD
- Install the intake manifold (see INTAKE MANIFOLD ).
- INSTALL INTAKE AIR CONNECTOR PIPE (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see INITIALIZATION ).
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal. - ADD ENGINE COOLANT (See COOLANT )
- CHECK FOR ENGINE COOLANT LEAKS
- Check for engine coolant leaks (see ON-VEHICLE INSPECTION ).
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- INSTALL V - BANK COVER (See INSTALLATION )