Throttle Body: Installation
- INSTALL THROTTLE BODY
- Install a new gasket and the throttle body with the 2 bolts and 2 nuts.
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Connect the 2 water by-pass hoses.
- Connect the ventilation hose.
- Connect the connector.
- Install a new gasket and the throttle body with the 2 bolts and 2 nuts.
- INSTALL INTAKE AIR CONNECTOR PIPE
- Install the connector pipe with the bolt and 2 hose clamps.
Torque: 4.0 N*m (41 kgf*cm, 35 ft.*lbf) for hose clamps
5.0 N*m (51 kgf*cm, 44 ft.*lbf) for bolt
- Connect the air hose and No. 1 ventilation hose.
- Install the connector pipe with the bolt and 2 hose clamps.
- INSTALL NO. 1 AIR CLEANER INLET
- Install the air cleaner inlet with the bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- INSTALL V - BANK COVER
- Install the cover with the 2 clips.
- Install the 2 nuts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see INITIALIZATION ).
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal. - ADD ENGINE COOLANT (See COOLANT )
- CHECK FOR ENGINE COOLANT LEAKS (See ON-VEHICLE INSPECTION )