Installation (From 10/2008)
- INSTALL ECM
- Insert the ECM into the ECM box.
- Install the ECM to the ECM box with the 2 nuts.
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
- Connect the 5 ECM connectors.
- INSTALL ECM BOX COVER
- Install the ECM box cover with the 3 bolts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the ECM box cover with the 3 bolts.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization. Refer to INITIALIZATION
.NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization. Refer to INITIALIZATION
.