| Includes: R&I Engine and Transmission Assembly with Front Suspension.
Includes: Recover, Evacuate and Recharge Air Conditioning System.
DOES NOT include wheel alignment. | 11.6 | | C |
| Combination Procedure: CONVERTER: Drain & Test: |
| | 0.2 | | C |
| Combination Procedure: CRANKSHAFT MAIN OIL SEAL: Remove & Replace: |
| Rear | | 0.4 | | B |
| Combination Procedure: FLYWHEEL: Remove & Replace: |
| | 0.2 | | C |
| Combination Procedure: INPUT SHAFT SEAL: Remove & Replace: |
| | 0.2 | | B |
| Combination Procedure: OIL PUMP: Remove & Replace: |
| | 1.1 | | B |
| Combination Procedure: OIL PUMP SEAL: Remove & Replace: |
| | 0.6 | | B |
| Combination Procedure: OUTPUT SEAL: Remove & Replace: |
| Each | | 0.2 | | B |
| Combination Procedure: TORQUE CONVERTER: Remove & Replace: |
| | 0.1 | | C |
| Combination Procedure: TRANSMISSION ASSEMBLY: Replace: |
| Includes: Programming. | 0.8 | | C |
| Combination Procedure: TRANSMISSION OIL COOLER: Clean: |
| | 0.5 | | C |