Installation [10/2020 - ]: Procedure
- INSTALL NO. 2 ECM BRACKET
- Install the No. 2 ECM bracket to the ECM with the 2 bolts.
Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf)
NOTE:If the ECM has been struck or dropped, replace it.
- Install the No. 2 ECM bracket to the ECM with the 2 bolts.
- INSTALL NO. 1 ECM BRACKET
- Install the No. 1 ECM bracket to the ECM with the 2 bolts.
Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf)
NOTE:If the ECM has been struck or dropped, replace it.
- Install the No. 1 ECM bracket to the ECM with the 2 bolts.
- INSTALL ECM
- Install the ECM with the 2 nuts.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
NOTE:If the ECM has been struck or dropped, replace it.
- Connect the 2 connectors to the ECM and push down the lever to lock it.NOTE:
- When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other parts.
- Make sure that the 2 levers are securely locked.
- Install the ECM with the 2 nuts.
- INSTALL LOWER RADIATOR AIR DEFLECTOR
Refer to PROCEDURE - Step 43 [10/2017 - 10/2023] , or refer to PROCEDURE - Step 31 [10/2023 - ]
- INSTALL UPPER RADIATOR SUPPORT SEAL
Refer to PROCEDURE - Step 44 [10/2017 - 10/2023] , or refer to PROCEDURE - Step 32 [10/2023 - ]
- INSTALL RADIATOR COVER PLATE
Refer to PROCEDURE - Step 45 [10/2017 - 10/2023] , or refer to PROCEDURE - Step 33 [10/2023 - ]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to INSTALLATION [10/2020 - 10/2023] , or refer to INSTALLATION [10/2023 - ]
- INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
Refer to WORK PROCEDURE [10/2020 - 11/2021] , or refer to WORK PROCEDURE [11/2021 - 10/2022] , or refer to WORK PROCEDURE [10/2022 - ]
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
Refer to AUTOMATIC LEARNING CHART [10/2020 - 11/2021] , or refer to AUTOMATIC LEARNING CHART [11/2021 - 10/2023] , or refer to AUTOMATIC LEARNING CHART [10/2023 - ]