LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lincoln >> 2006 >> LS >> Repair and Diagnosis >> Accessories & Equipment >> Communication Devices >> Module Communications Network System >> Diagnosis And Testing >> Communications Network >> Inspection and Verification >> System Precheck
April 5, 2026: LEMON Manuals is launched! Read the announcement.

System Precheck

PINPOINT TEST PC: DATA LINK DIAGNOSTICS NETWORK TEST

Test Step Result/Action to Take
PC1 RUN THE DATA LINK DIAGNOSTICS NETWORK TEST  Yes 
The test passed. RETURN to the Symptom Chart of the module in question.
No 
If no response from the diagnostic tool, Go To PINPOINT TEST T .
If ISO, CAN, UBP, or SCP = SOME ECUS NO RESP/NOT EQUIP, GO to SYMPTOM CHART .
If ISO = ALL ECUS NO RESP/NOT EQUIP, Go To PINPOINT TEST P .
If SCP = ALL ECUS NO RESP/NOT EQUIP, Go To PINPOINT TEST O .
If the module in question is NO RESPONSE/NOT EQUIPPED, GO to SYMPTOM CHART .
If CAN = ALL ECUS NO RESP/NOT EQUIP, Go To PINPOINT TEST H .
  • Carry out the diagnostic tool data link test.
  • Is system passed obtained?