LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lincoln >> 2006 >> Zephyr >> Repair and Diagnosis >> Brakes >> Traction Control >> Vehicle Dynamic Systems >> Diagnosis And Testing >> Anti-Lock Control >> Pinpoint Tests >> Pinpoint Test I: Poor Vehicle Tracking During Anti-Lock Function >> Normal Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Normal Operation

The operating voltage required to supply the anti-lock brake system (ABS) module, hydraulic pump and isolation valves is in a range between 10 and 16 volts.

Fused battery voltage is supplied to the ABS module from battery junction box (BJB) fuses 10 (20A) and 36 (40A) along circuits SBB10 (YE/RD) and SBB36 (GN/RD) respectively. Fused ignition voltage is supplied to the ABS module from smart junction box (SJB) fuse 28 (10A) along CBP19 (BN/WH) and ground is provided along circuit GD123 (BK/GY).