LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 1978 >> Cosmo Standard Trans >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Ignition Timing Control - Rotary >> Testing >> Relays >> 1978-79 RX7
April 5, 2026: LEMON Manuals is launched! Read the announcement.

1978-79 RX7

  1. Disconnect wiring from relay. With no power applied, continuity should exist between terminals No. 1 and 2, No. 4 and No. 2, and terminals No. 4 and 1. No continuity should exist between terminals No. 3 and No. 2, or terminals No. 3 and 4.
  2. Connect battery positive lead to terminal No. 6 and negative lead to terminal No. 5. Continuity should exist between terminals No. 3 and 2, and between terminals No. 4 and 3. No continuity should exist between terminals No. 1 and 2, No. 4 and 2, or terminals No. 1 and 4. If relay does not test as described, replace it.
Fig 1: Relay Terminal Identification
G09310041Courtesy of MAZDA MOTORS CORP.