LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 1984 >> GLC 2D Hatchback >> Repair and Diagnosis >> Engine Performance >> System >> Feedback Carburetor System >> Testing >> GLC Control Units
April 5, 2026: LEMON Manuals is launched! Read the announcement.

GLC Control Units

  1. The control unit may be tested with a voltmeter. Engine must be at operating temperature. For testing, ignition switch must be "ON" and engine not running. Measure voltage at each terminal and compare values to appropriate Control Unit Testing chart.
CONTROL UNIT TESTING

Terminal  Connection  Voltage  Checking Condition 
A Ignition Signal 12V Ignition switch "ON"
B Battery Power 12V Ignition switch "ON"
C A/C Signal 12V A/C "ON" (all eng. speed)
D Slow Fuel Cut Solenoid 12V At 2500 RPM w/ terminals m and o disconnected
E,I,n - - Not necessary to check
F Air/Fuel Solenoid 0-12V At idle speed
H Throttle Positioner Solenoid 12V At 1700 RPM
K EGR Solenoid 12V At 2500 RPM
M ACV Solenoid 12V At idle speed
N,p,r Ground 0V Ignition switch "ON"
a O2 Sensor 0-1V At idle speed
b O2 Sensor (Sealed) 0V Ignition switch "ON"
c Water Temperature Sensor 1.2V At idle speed
d Ground (Water Temp. Sensor) 1.2V Ignition Switch "ON"
j Power Steering 12V Power Steering "OFF"
k-l Vacuum Switch 10V Ignition switch "ON"
m Neutral & Clutch 0V At idle speed
o Idle Switch 10V At idle speed
q Water Thermo Switch 0V At idle speed