Testing with Voltmeter
- Engine must be at normal operating temperature and transmission in Neutral (Park on A/T models). Using a voltmeter, check the control unit using CONTROL UNIT CHECK chart as a guide.
- When more than one Checking Condition is listed, all conditions must be checked. Connect the negative probe of voltmeter to ground and positive probe to other terminals as described.
- If a problem exists, check circuit to which terminals is connected. If circuit is normal, replace control unit.