LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 1994 >> 929 >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Engine Assembly: Remove, Install, and Overhaul

PISTON ENGINE

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
O.H.C.- DOHC32.2A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
V6, Where Air Cond interferes add0.7A
V6, Where Pwr Strg interferes add0.3A